 Project
at Alexandria port |
Project
objective
-
-
Increasing the unloading capacity of platform
85/1 to 1200 ton/hr .
- Adapting platform 85/1 to receive ships up to 70.000 ton capacity
and 42 feet depth.
-
Accommodating
the
platform to unload the bulk grains like maize
wheat and beans and convey it to the main silos of GCSS at
Alexandria port through the electronic weighing scale .
Main Components of the Project
-
-Two mobile Pneumatic unloading evacuators moving on rails with
total unloading capacity of 1200 t / hr .
-Two belt conveyor lines with total Capacity
of 1200 t/hr along
platform 85/1 ( 1&2 ).
-
Two belt conveyor lines Extended to the existing
two belt conveyor
on lines ( 3&6 ) .
-Transfer
Tower with Two electronic accumulator balance each of
Capacity 600 t/hr .
- Dedusting System .
- operation & Control room .
-Weight
of system equipment and steel structure
is about 1000 tons .
|